OUR PROJECTS
MECHANICAL & PLUMBING

Chemeketa Community College Building #40/41
New Construction: MEP and Fire Sprinkler Performance design services for 10,000 square foot, 2-story administrative building.
Renovation: MEP design services for remodeling 5,600 square foot facilities shop.

Albany Historic Carousel & Museum
New Construction in Progress: MEP and Fire Sprinkler Performance design services for 19,500 square foot, historic carousel amusement.

Philomath Elementary School Renovations
Renovation: MEP and Fire Sprinkler Performance design services for 42,000 square foot elementary school.

Philomath Middle
School Renovations
Renovation: Controls, Electrical, Plumbing and Fire Sprinkler Performance design services for 63,000 square foot middle school.

Sand Point Idaho Library Remodel & Expansion
Renovation and New Construction: Mechanical and Plumbing design services for renovation of 9,300 square foot Sand Point Public Library, Idaho.

Gunter Hotel, San Antonio
Multi-discipline renovation of 168,000 square foot historical hotel in downtown San Antonio.

Legacy Villas
New Construction: Mechanical and Plumbing design services for new 35,000 square foot residential apartments and club house.

Pearson Packaging
Remodel: Mechanical and Plumbing design services for 13,000 square foot office space remodel.
-New ducting for existing Rooftop Gas Pack/Dx equipment
-New Split System / Multizone
-New plumbing

University of Idaho Residence Hall Dining Remodel
Remodel: Mechanical and Plumbing design services for 11,500 square foot dining hall/kitchen remodel.

Tulalip Elders Center Kitchen Expansion
Remodel/Expansion: Mechanical and Plumbing design services for 1,800 square kitchen remodel/expansion.

Pendleton RoundUp Retail Center
New Construction: Mechanical and Plumbing design services for new 18,400 square foot retail, ticketing, and offices.
-8 Packaged Gas/Dx Rooftop units
-Exhaust fans
-Mini-split Dx cooling for Data

Union School District Renovations
Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing Steam Heat with Hydronic Hot Water and Heat

Eastern Oregon Rest Stop Renovations
Renovation: Mechanical and Plumbing budgeting and design services for district wide renovations; 62,000 square feet.
-Replace existing electric furnaces
-Heat Recovery Ventilation

Private Residence Walla Walla
New Construction: New private residence; 9,500 square feet.
-Forced air systems
-Heat Recovery Ventilation
-Photovoltaic system
-Misc. exhaust systems

Shabby Fabrics
New Construction: Mechanical and Plumbing design services for new 17,500 square foot offices, warehouse, and production.
MECHANICAL

Portland Public Schools Boiler Conversions
Retrofit: Mechanical design services for the conversion of boiler fuel oil burners to natural gas burners.

La Grande H.S.
Mechanical Upgrades
Retrofit: Mechanical design services for the renovation of mechanical HVAC and plumbing systems.

La Grande Greenwood E.S. Upgrades
Retrofit: Mechanical design services for the renovation of mechanical HVAC systems.

La Grande Island City E.S. Upgrades
Renovation: Controls, Electrical, Plumbing and Fire Sprinkler Performance design services for 63,000 square foot middle school.

La Grande Middle School Upgrades
Retrofit: Mechanical design services for the renovation of mechanical HVAC systems.

Wells Fargo Bank Call Center Chiller Replacement
Retrofit: Mechanical design services for the replacement of central chillers.

ODOT HVAC REPLACEMENT
R1 HEADQUARTERS
Retrofit: Mechanical design services for the replacement of Rooftop VAV/electric airhandlers.

CONRAD ROSE MANSION
Renovation: Mechanical design services for four story, 24,000 square foot office building and data room HVAC systems.

Philomath, Clemens Community Pool
Retrofit: Mechanical and Controls design services for the refurbishment of pool HVAC.
-Refurbishment and DDC controls for pool airhandler

Whitman College Anderson Hall HRV System
Retrofit: Mechanical and Controls design services for the replacement and relocation of restroom heat recovery ventilation systems.

Hedrick M.S. HVAC Remodel
Remodel: Mechanical and Controls design services for the replacement of 60,000 square foot middle school duct board ducting.

McLoughlin M.S. HVAC Remodel
Remodel: Mechanical and Controls design services for the replacement of 62,000 square foot middle school duct board ducting.

Clean Water Services Condenser Relocation
Retrofit: Mechanical design services for the relocation of refrigerant condensing equipment, In fluent Pump Station Cooling System.

Chemeketa Community College Santiam Boiler
Retrofit: Mechanical design services for the replacement of existing heating water boiler and ancillary equipment.

Chemeketa Community College Building #2 Boiler
Retrofit: Mechanical design services for the replacement of existing heating water boiler and ancillary equipment.

OREGON DAS Pendleton Office Building Boiler
Retrofit: Mechanical design services for the replacement of existing heating water boiler and boiler plant equipment.

Goodfellow Brothers Inc. Headquarters
Remodel: Mechanical design services for 11,000 square foot office building HVAC system.

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM
Retrofit: Mechanical design services for the replacement of central chillers.

SUPERIOR FRUIT
New Construction: Mechanical design services for 33,700 square foot office building and manufacturing facility HVAC system.

EASTERN OREGON UNIVERSITY SNOW MELT EXPANSION
Renovation: Mechanical design services for renovation and expansion of 14,000 square foot snow melt system.

Central Medford Steam Boiler Replacement
Retrofit: Replace existing fire tube steam boilers with new gas fired, sectional steam boilers.

OREGON DAS Pendleton Office Building HVAC
Renovation: Replace existing HVAC system with new.

Force Majeure Winery
Calculations and Compliance: Heat load calculations and code compliance documentation.

Enterprise School District Facilities Assessment
Facilities Condition Assessment: Work as part of a team to provide Oregon Department of Education (ODE)

Enterprise School District Long Range Facility Plan
Budgeting: Facilities evaluation and cost estimating for Long Range Facility Planning.

Shaver Transportation Offices
New Construction: Mechanical HVAC design services for new 3,600 square foot office building.
-17 zone Split System VRF
-Heat Recovery Ventilation
-Miscellaneous Electric Heaters

Walla Walla Valley Academy Lodge
New Construction: Mechanical and Plumbing design services for mountain lodge; 12,400 square feet.
-Forced air furnaces
-Miscellaneous exhaust systems
-Gas piping

City of La Grande City Hall
HVAC Upgrades: Mechanical calculations and specification for HVAC upgrades; 22,500 square feet.
-Split System Multizone Heat Pumps
-Heat Recovery Ventilation
-Heat load calculations
-Construction specifications

Associated Veterinary Medical Center
Upgrades: Expansion/renovation and associated Mechanical HVAC design services; 5,000 square feet.
-Rooftop airhandler
-Exhaust fans
-Unit Heaters
-Building Heat Load Calculations

Telstra Tennant Improvements
Tennant Improvements: Mechanical design services for office building renovation; 6,000 square meteres.
-Rezoning and ducting to accommodate new floor plans
-Heat load calculations
-Miscellaneous exhaust systems

Milton-Freewater High School Gym HVAC
Renovation: Mechanical design services for HVAC renovation; 38,000 square feet.
-Replace steam heat with Natural Gas Furnaces
-Variable speed drives
-New packaged rooftop equipment

Sustainable Timber Tasmania Expansion
Renovation and New Construction: Mechanical design services for office building renovation and expansion; 746 square meteres.
-Multizone Split System Heat Pumps
-Heat Recovery Ventilation System

Winery Expansion - Wine Tasting Area
Renovation: New wine tasting area; 2,200 square feet.
-Forced air heat pump system
-Misc. exhaust systems
-Domestic hot water
-Building Heat Load Calculations

Private Residence
New Construction: New private residence; 2,200 square feet.
-Split System heat pump
-Heat Recovery ventilation
-Domestic hot water

Weston Middle School Classroom HVAC
Renovation: HVAC upgrade for classroom spaces; 2,700 square feet.
-Packaged multizone HVAC system
-Controls schematics
-Specifications package

Island City School Remodel
Remodel: Computer classroom with storage remodel. HVAC modifications and controls to existing; 15,000 square feet.
-Rezoning for existing HVAC system
-Modifications to central boiler

MF Central Middle School HVAC
Renovation: Mechanical design services for HVAC renovation; 18,000 square feet.
-Replace existing packaged HVAC
-Multizone dual deck Direct Digital Controls design
MEDICAL / INDUSTRIAL

Saint Anthony Hospital USP-40 Pharmacy Update
Renovation: Mechanical HVAC design services for USP-40 / NF-35 update to pharmacy hazardous drug compounding areas.

EOU Loso Hall Exhaust System Improvements
Renovation: Mechanical HVAC design services for industrial exhaust system remediation/replacement including foundry, welding, ceramics, kilns, paint, and printmaking.

Whitman College Physics Dept. Laser Engraver
Design: Direct exhaust system for new laser engraver.

Garland Animal Clinic
Design: Oxygen and Waste Anesthetic Gas Disposal systems; NFPA 99 and 704, IFC

Wenatchee Pediatric Dentistry
Renovation: Mechanical, Plumbing, and Medical Gas design services for 8,300 square foot pediatric dental office.

Linde - Industrial Gases
Drafting: Drawing updates for CO2 system Process and Instrumentation Diagrams

ODFW Vetrinary Laboratory Improvements
Renovation: Renovation and expansion of 1,500 square foot existing office spaces and veterinary/research laboratory.

Furniture Restoration Center
Analysis: Code analysis of furniture spray facility; NFPA 704, NFPA 15, and NFPA 33

Umatilla Electric Cooperative Substation
Calculations: Cooling load calculations on electrical sub-station.

Boubleback Winery Barrel Storage
New Construction: New wine barrel storage and shipping office; 5,400 square feet.
COMMISSIONING

SOU Churchill Hall Commissioning
Renovation: Commissioning services for remodeled 86-year-old Southern Oregon University Churchill Hall. $6.4 million renovation, 32,000 square feet, 3-stories.

Ashland School District High School Commissioning
Renovation and New Construction: Commissioning services for renovation of Ashland High School HVAC upgrades and new Gymnasium and classroom spaces.

Eugene State Office Building
Renovation and New Construction: Commissioning services for four story, 32,000 square foot state office building. 1102 Lincoln Street, Eugene, Oregon

Oregon State Police Crime Laboratory
Renovation: Commissioning services for 8,720 square foot state police crime laboratory and offices. Clackamas, Oregon

North Medford High School
Renovation and New Construction: Commissioning services for 250,000 square foot high school mechanical upgrades. Medford, Oregon

South Medford High School
Renovation and New Construction: Commissioning services for 250,000 square foot high school mechanical upgrades. Medford, Oregon

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM
Retrofit: Commissioning services for the replacement of central chillers.

Grande Ronde
Hospital USP-797
Pharmacy Update
Retrofit: Commissioning services for USP-797 remodel to pharmacy and drug compounding areas.

Da Vinci Middle School
Mechanical Controls Upgrades: Commissioning services for 84,000 square foot middle school. Portland, Oregon

Russell Academy
Renovation: Commissioning services for 32,500 square foot elementary school. Portland, Oregon

Oak Grove Elementary
New Construction & Renovation: Commissioning services for 22,700 square foot elementary school. Medford, Oregon

Lone Pine Elementary
New Construction & Renovation: Commissioning services for 51,900 square foot elementary school. Medford, Oregon

Jackson Elementary
New Construction & Renovation: Commissioning services for 51,900 square foot elementary school. Medford, Oregon

Roosevelt Elementary
New Construction & Renovation: Commissioning services for 51,000 square foot elementary school. Medford, Oregon

North Medford H.S. Media Center
New Construction: Commissioning services for 20,000 square foot media center. Medford, Oregon

Union School District HS Commissioning
Renovation: Commissioning services for Mechanical and Plumbing budgeting and design services for
ENERGY

Providence Medical Center Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for DDC controls re-programming, mechanical work for system optimization, variable speed...

Willamette University Central Steam Heat System
Analysis: Energy model and life cycle cost (LCC) analysis for central steam heating system (700 boiler horsepower, 543,000 square foot campus system).

Joseph School Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 74,000 square foot K-12 school campus.

Providence Saint Vincent MOB3 Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report

Whitman College Baker Center
Analysis: Energy model and Retro-Commissioning Report analysis for 9,700 square foot office space.

CITY OF SALEM CIVIC CENTER CHILLER SYSTEM
Analysis: Energy model and life cycle cost (LCC) analysis for hydronic chilled water system for 200,000 square foot city hall, police center, library, offices, and retail.

ANTOINETTE HATFIELD HALL
Analysis: Energy analysis for potential EcoRoof (Green Roof) on 137,000 square foot performing arts theater and offices.

Clatsop County Public Services Building
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC upgrade for 14,000 square foot office space.

BMCC Columbia Hall Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC energy improvements on 15,500 square foot community college building.

Umatilla HS Water Loop Heat Exchanger
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Energy analysis for replacing plate and frame heat exchanger.

Enterprise School Site Evaluation
Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report. Assessment of energy consuming equipment and potential energy savings measures.

Geiser Grande Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC and plumbing energy improvements on 37,900 square foot hotel and restaurant.

HISTORIC BENTON COUNTY CIRCUIT COURT HOUSE
Analysis: Energy model and life cycle cost (LCC) analysis for hydronic geothermal heating system for 28,000 square foot courthouse and offices.

Figgins Family Wine Estates Production and Tasting
Calculations and Compliance: Heat load calculations and code compliance documentation.

Union County Law Enforcement Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 26,000 square foot law enforcement offices and jail.

The Walls Winery
Calculations and Compliance: Heat load calculations and code compliance documentation.
-Heat load calculations and Sate of Washington Energy Code compliance documentation for tasting room, kitchen, office spaces, storage, and lab.

Baker County Library Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for HVAC controls improvements on 15,800 square foot library.

Providence Process Chiller Technical Analysis Study
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report. Analysis for process chilled water system improvements
-OpenStudio / EnergyPlus model of building energy

Pendleton Center for the Arts Site Evaluation
Analysis: Energy Trust of Oregon (ETO) Site Evaluation Report (ASHRAE Level I). Assessment of energy consuming equipment and potential energy savings measures.

Private Residence Walla Walla
New Construction: New Net-Zero private residence; 9,500 square feet.
-Forced air systems
-Radiant floors
-Heat Recovery Ventilation
-Photovoltaic system

9 West Alder Salon
Tennant Improvements: Mechanical, Lighting; 980 square feet.
-Ventilation and associated controls
-Electrical and Lighting and controls
-Washington State Energy Code Compliance documentation (Envelope, Mechanical, Electrical)

Philomath, Clemens Community Pool Solar Analysis
Analysis: Energy model and life cycle cost (LCC) analysis for pool solar retrofit purchasing options (100,000 gallon pool).

Oregon Cascades West Council of Governments
Analysis: Energy model and Energy Trust of Oregon (ETO) Technical Analysis Report analysis for HVAC upgrade for 34,000 square foot office space.

Doubleback Winery Barrel Storage
Calculations and Compliance: Heat load calculations and code compliance documentation.

Private Residence - Washington Container House
Calculations and Compliance: Heating and Cooling load calculations and code compliance documentation.

Waste Water Treatment Energy Model
Computational model for simulation, analysis, and prediction a waste water treatment plant process heating energy consumption

Gould Academy Dormitory
Energy audit (ASHRAE Level II), energy model, and cost benefit analysis for variable refrigerant flow heating and cooling system for 31,000 square foot dormitory.